Step 1: Is the primary use full-time dwelling on this SF lot?
Yes — full-time dwelling→ continue at #adu-path
Bias toward a permanent-foundation ADU unless SF expressly allows a moveable tiny house as an ADU on this lot.
No — workshop / storage / seasonal→ continue at #non-dwelling
Do not assume dwelling rights later. A change of use requires Planning confirmation before occupancy.